[Openswan Users] UCR 2008 Change 1 compliance
Chen, Xuli (James)
chenja at avaya.com
Tue Mar 15 14:31:14 EDT 2011
Hi,
Does openswan comply with following requirements?
5.4.6.2.1.6.1.g.2 - The product shall be capable of ensuring that the effective date falls within the certificate's validity period. NOTE: The effective date is the date when the transaction was initiated. Normally, the effective date should be considered the current date unless reliable evidence exists to establish an earlier effective date. [Required: MFSS, SS, LSC, MG, EBC, RSF, R, AEI - Conditional: EI]
5.4.6.2.1.6.1.g.4.c - The product shall be capable of searching the list of revoked certificates to determine that the target certificate is not included or the revocation date is after the effective date. [Required: MFSS, SS, LSC, MG, EBC, RSF, R, AEI - Conditional: EI]
5.4.6.2.1.6.1.e.3 - The product shall be capable of requesting and accepting information regarding the status of certificates using CRLs or the On-line Status Check Protocol (OCSP) as defined in RFC 2560 and in the DoD PKI Functional Interface Specification dated June 2007. [Required: MFSS, SS, LSC, MG, EBC, RSF, R, AEI]
Thanks,
James
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.openswan.org/pipermail/users/attachments/20110315/68630c4e/attachment.html
More information about the Users
mailing list